The new binding urban plan for Warsaw`s Plac Defilad considers -in the closest vicinity of the palace of culture :3 buildings as tall as 233 , 245 and 220 m .
and in the area closer to Aleje Jerozolimskie the height of buildings must be a little lower , as figh as 128 - 140 m , on the other side of the square , again some lower buildings . It will be built exactly the way it is showed in a visualization placed in my first post .
The cost of the infrastructure will be about 550 milions zł , but the income from the sales of lots to private investors should be as high as 662 milions of zł , so the budget of the city will be balanced .
The green area will be increased by 1 hectare from the existing area . Besides of the office buildings and shops there will be a museum of modern art and the public space for everyone , so the area will be the real thriving centre for people all day round .
The aldermans who voted for this plan didn`t say a word about geological problems ,the same as planists , architects and construction engineers, whose plan was officially approved .
BTW - the construction of subway in Warsaw is going very fast.
The progress in building of Złota 44 developement is very fast and it is an absolute priority for the developer - Orco Group
Developer Orco Property Group is determined and makes every effort to ensure that the building was visible in all its glory at Euro 2012 By achieving such a rapid pace of construction will be the most possible. Due to the strong acceleration of the pace of work increased number of team building - currently in investment employs over 120 people. Number of workers from that time will gradually increase . Currently are assembled formwork and load-bearing walls next 23 floors. On a construction site a few weeks are already two tower cranes . Each of them has more than a hundred meters high. Their height will grow together with the construction of the next floor . One of the cranes will measure 203 m , the second - 192 m , ie its height live up Golden . The work also supports one auxiliary crane . To facilitate the work of the workers as well as for safety reasons at the three highest floors of building mounted wind deflector has been RCS . Thanks to a height of over 75 meters , even strongly blowing in the wind does not preclude workers working there . In summer, B. R. will start the installation of the building facade. We are currently working on a project of this unique façade and preparing for its production.
The progress in the construction of the second line of subway is also very fast thanks to the unique drilling method allowing to move as fast as 1 km per month ( there will be six stations, some parts of the tunel will be swiped under Wisła river . This is the third largest developement in Poland . The whole line will be completed in 2013 .